Getting things started Daniel would notch and section the rear frame rails along with throwing in an AMS custom built 4-link set up. Next a set of DJM drop spindles would be bolted up and the Optima battery relocated to the bed allowing the 22 Oasis BI's wrapped in 265/35's upfront to tuck along with 295/30's rubber out back.
2
2
To make sure there was plenty of clearance to clear the large wheels, a set of Comtech Airbags would be installed at all 4 corners.
With the body at proper height with adjustability it was time to hit up the exterior of his ride. For starters Daniel would remove the stock front clip and toss it aside. Next a full Cadillac Escalade front clip would be bolted up.
2
2
2
The hood, fenders, grille, bumper and lights would all be mounted and set perfect. After that the doors would be shaved of the handles and the gas filler door would be relocated to the bed.