Photos
stock frame
2009-09-21
bed ready for tubs
2009-09-21
tubs welded up
2009-09-21
tubs and notch cover sealed up
2009-09-21
primed
2009-09-21
notches welded up
2009-09-21
notch and bridge welded up
2009-09-21
front bags and shocks mounted
2009-09-21
checking clearances up front
2009-09-21
making room for tubs
2009-09-21
driver side tub
2009-09-21
passenger side tub
2009-09-21
tank and compressors mounted
2009-09-21
rear section of frame painted
2009-09-21
custom 3 link
2009-09-21
3 link front mount on frame
2009-09-21
rear section done
2009-09-21
hoses all plummed and ready to test suspension
2009-09-21
all back together
2009-09-21
Suspension
re-6 all around,3 link in rear, 2 viair 380, 5 gal. tank, accuair 8way manifold valve, AVS controller
Future Plans
shave everything, paint, interior, stereo, and 22"